A recent study commissioned by the New Brunswick Department of Transportation and Infrastructure to investigate flooding in the Town of Sackville has now been completed. The study, undertaken by HILCON Limited, examines the major stormwater infrastructure in the Carters Brook Watershed. As part of the study, a stormwater management model was developed to evaluate the hydraulic performance of the overall system in this area.
A copy of the report can be found here. Questions on the study can be directed to the Town of Sackville Department of Engineering and Public Works at 364-4960.